Permits Requirements

You will need a permit for any of the following:

  • New Construction
  • Accessory Building
  • Pools
  • Siding
  • Windows, Roofing, Siding
  • Signs
  • Fences over six feet tall
  • Additions
  • Any alteration(s) to a structure other than cosmetic (painting, flooring etc)
  1. Conservation signature and a copy of the Order of Conditions, if applicable
  2. Fire Department signature
  3. Collector/Treasurer's signature (Note: Map and Parcel Number may be obtained from the Assessor's Office)
  4. Department of Public Works Driveway Permit
  5. Board of Health Disposal of Works Permit
  6. One copy of Construction Plans
  7. One Copy of of Plot Plan, please note: a certified plot plan must be provided once the foundation is poured
  8. Mass Check (May be obtained from Lumber Company)
  9. Please complete all sections of the application and all required signatures
  10. Once the permit is approved, you may start construction

Construction must start within 180 days of the Approval Date (unless an extension has been requested and granted).